There are individual buildings and industrial installations who have power use in the megawatt range, getting this much power to a charging station is definitely possible, but would need to be coordinated with the grid operator, and require high voltage run directly to the station.
There is a series of appeals you can make when you don't agree with something, which is the course this person has followed, and are there for good reason.
The only reason he's in this situation is his own stupidity and stubbornness.
I'd say four of these are accurate.