Amateurs.
The 1963 Černý Důl – Kunčice nad Labem aerial ropeway is over 8 km (5 mi) long, over 30 m high in places and carries 135 tons of limestone every hour from a quarry to the nearest train station. Its 120kW 3-phase synchronous motor requires power for a few minutes at the start and end of each day when most of the 800kg-capacity trolleys are empty, and spends most of the shift generating mains electricity and acting as a speed governor. Unlike the EV, it is fully autonomous most of the way, only 5 people are required to operate it. (Loading, unloading and timed dispatching is automatic, arriving/leaving carts just need to be checked; a safety latch has to be manually dis/engaged on trolleys passing the check.) The quarry will continue operation as long as it pays off, then the ropeway will be scrapped (projected 2033). A dude illegally rode the way up on it somewhat recently. He could have fallen to his death if he pulled the latch.
Not very smart that they waste all that energy in mechanical brakes. See my comment (the one with the picture) for a way bigger and electricity-generating ropeway, including a video of a guy less squeamish than Tom Scott riding most of the 45-minute way up.